    Scholars Journal of Engineering and Technology | Volume-3 | Issue-04
        Case Study on Overhaul Performance of Excavator CAT 320 Series by Lean Production Program
        Chin-Chiuan Lin, Chang-Jiang Lee, Hsin-Yao Kuo
        
            Published:  April 22, 2015 | 
             242
             522
        
        DOI:  10.36347/sjet
        Pages:  390-396
        Downloads
        
        Abstract
        Present study developed and proposed improve steps of Overhaul process which conducted by lean production
program. The research procedure includes four stages: analyze the current status, establish improve steps, implement
improve step, and confirm improved status after implement improve step. The eight types of waste was confirmed and
the improve steps was established after analyze the current status. After implement the improving steps, the Overhaul
days was reduced from 88 to 49 days, reduced about 5% of costs, and increased about 18% of profit. The results were
confirmed that the Overhaul performance of excavator can be improved by the improving steps which conducted by lean
production program.
    