Measurement of Productivity Using Work Sampling Method at Menara Sentraya building Project Jakarta Indonesia
Atfal Murodif, Erizal, Meiske Widyarti
Published: May 30, 2016 | 118 69
DOI: 10.36347/sjet
Pages: 244-248
Downloads
Abstract
Costruction management should be able to know some ways to measure workers productivity before making an effort to improve productivity. Productivity is one of the most important issues in both developed and developing building construction. The research objective were to analyze labor productivity by using work sampling method, It is used to obtain Labor Utilization Rate (LUR) value. The LUR analysis results of formwork, reinforcement, and concreting are 47.32%, 43.17%, and 49.76%. Total LUR of three work type is 45.60%. It is can concluded that the productivity is still relatively high.