An International Publisher for Academic and Scientific Journals
Author Login 
Scholars Journal of Engineering and Technology | Volume-5 | Issue-02
Minimizing Reworks, Rejection Rate and Time Waste in a Textile Industry Using Sixsigma Tools
Bharath S, Arvind V, Prashanth AS
Published: Feb. 28, 2017 | 129 695
DOI: 10.21276/sjet.2017.5.2.7
Pages: 70-75
Downloads
Abstract
The main aim of this project is to minimize the occurrences of rework, higher rejection rate and eliminate time waste in a textile industry using sixsigma tools and techniques. As a result of this project reduction in standard minute value (SMV) is obtained, labor productivity is improved last but not least a considerable improvement in production rate and inline efficiency is achieved. To achieve this target sixsigma tools such as SIPOC diagram, Pareto analysis, brainstorming and fishbone diagram are used.